Kitchen Remodeling in Snellville

A layout that finally works, or new cabinetry, counters and lighting on the one you have, with hardware, seams and outlet spots settled before install.

Talk cabinets, counters and layout at (000) 000-0000
Kitchen remodeling project

The Details You'll Touch Every Day

In a kitchen, small choices get used constantly: which side the trash pullout sits on, how the drawers are divided, where outlets land along the backsplash, which way the island seating faces. We ask about them early, because changing them after the cabinets are ordered costs time and money.

Layout is the larger decision. A kitchen whose sink, range and walls stay put is a smaller job than one where water lines and circuits follow a new island, and your estimate prices each move separately.

What's Part of a Kitchen Remodel

  • Cabinets and storage

    Cabinet boxes set level and fastened to the wall framing, doors adjusted to even gaps, and drawer and pullout layouts chosen around what you actually store.

  • Countertops and backsplash

    Counter material and edge profile, seam locations agreed in advance, and backsplash tile run to the height and stopping point you choose.

  • Lighting and outlets

    Under-cabinet lights, fixtures over the island or sink, and outlets placed where appliances will actually sit, all part of the remodel's electrical scope.

  • Layout changes

    Islands added, walls opened or a sink moved, with the plumbing and wiring that follows handled within the same remodel and the same contract.

From Choices to Cabinets

  1. Settle the layout

    We agree on where everything goes first: sink, range, refrigerator, island and walls. That decision drives most of the price and the length of the schedule.

  2. Pick finishes, then order

    Cabinets, counters, hardware and tile are chosen and ordered before demolition, so your old kitchen stays usable while the slower items are on the way.

  3. Install and adjust

    Cabinet boxes are set first and counters measured off them, then backsplash, lighting and hardware follow. Doors and drawers get adjusted before we call the kitchen finished.

Kitchen Questions

How long is the kitchen out of commission?

Most kitchen remodels take several weeks of construction once cabinets arrive, longer if walls move or an island needs new plumbing. Your written schedule shows the stretch, so you can set up a temporary spot for coffee and simple meals.

Can we keep our layout and still change a lot?

Yes. New cabinets, counters, lighting and backsplash on the same footprint can change how a kitchen looks and works without the cost of moving water lines and circuits.